Line to Gain Crew instructions PDF Print E-mail
GENERAL INSTRUCTIONS
FOR FOOTBALL LINE-TO-GAIN CREWS
The typical line-to-gain crew consists of at least three individuals – a down-box operator and two to hold the rods. Unless
otherwise possible by use of a fourth crew member, the down-box operator will attach the clip as specified. The crew
should be dressed uniformly in readily identifiable attire. Remind crew members that they are officials; not fans.
PREGAME DUTIES
1. The line-to-gain crew shall meet the LINESMAN on the sideline opposite the press box at least 15 minutes before game
time and also five minutes prior to the second-half kickoff. If an auxiliary down marker is used, operator shall meet the
LINE JUDGE on press-box side at the same time.
2. The LINESMAN shall make certain that the chain and the official down box have been placed opposite the press box or
the designated sideline and that all are in good working order and conform to the rules. The LINE JUDGE shall then make
certain that the auxiliary marker is in good working order and is placed on the opposite side of the field from the line-togain
crew.
3. The complete concentration of the crew is absolutely necessary if it is to discharge its duties efficiently. The crew must
refrain from showing any partisan reaction to the events taking place on the playing field. The crew must be prepared to
act immediately on instructions from the LINESMAN so that teams and all concerned will know the exact situation concerning
the down and yards to be gained. The crew shall not move or change the number of the down until signaled to
do so by the LINESMAN. The auxiliary down-box operator shall act only on instructions of the LINE JUDGE.
GAME PROCEDURES
1. On the LINESMAN’S signal, the crew must move as quickly as possible to the next position.
2. When a runner or pass receiver is going out of bounds in the immediate vicinity, the involved crew member is to quickly
and carefully drop the marker down and move away from the sideline, keeping his eye on the spot of the marker. The
crew member away from the play should hold his position if possible.
3. The LINESMAN will set the spot of all first downs by going to the sidelines and marking, while facing the field, the exact
spot where the rear stake will be set. The front crew member will then be sure the chain is fully extended before setting
his stake.
4. The DOWN-BOX OPERATOR, on every new series of downs, will set the box at the spot marked by the linesman. When
the line-to-gain equipment is moved, the rear rod is to be set behind the down marker and then the clip shall be placed
at the back edge of the 5-yard line nearest the rear rod. The marker must be held at all times in an upright position with
the down correctly shown.
5. The DOWN-BOX OPERATOR is to show the number of the down just completed and shall not indicate the new down until
so notified by the LINESMAN. On instruction from the LINESMAN, theh DOWN-BOX OPERATOR will move the down
marker to a new poisition with the marker placed at the forward point of the ball and change the marker to the correct
down.
6. On all measurements for first down when the chain is moved onto the field, the DOWN-BOX OPERATOR is to place his
marker at/off the spot of the front rod until a new series of downs is declared or the chain is returned to its previous position.
7. The DOWN-BOX OPERATOR should be aware of any penalty markers. The marker must not be moved nor the down
changed until so notified by the LINESMAN.
8. The chain is not extended if it is a first-and-goal situation. After the chain is clipped, remove it from the sideline. LINESMAN
should provide DOWN-BOX OPERATOR a bean bag in this situation to mark location of the box in case it is moved
during the down.
9. The DOWN-BOX OPERATOR should place the marker on the line of scrimmage on all try situations. This will aid players
and officials in determining the line of scrimmage on all plays toward the sideline. The chain will not be placed on a try.
10. If the sidelines become crowded and the crew does not have room to efficiently discharge its duties, the crew is to notify
the LINESMAN immediately so that a time-out may be called and sidelines cleared before the game will be allowed to
proceed.
11. If the game is delayed for any reason, the crew will stay with the officials.
12. Operating the equipment 6 feet off the sideline is for the protection of players, coaches and all persons who are part of
the game.
 
, Powered by Joomla! and designed by SiteGround reseller hosting